All calculators / Restaurants

Labor + Prime Cost Calculator

Food cost plus labor cost against revenue. See your prime cost and whether it is under the 60% benchmark.

$

COGS for the period: purchases ± inventory change.

$

Wages, salaries, payroll taxes, benefits — for the same period.

$

Sales after discounts and comps, before tax.

How this is calculated

Food cost % = food + beverage cost ÷ revenue.

Labor cost % = total labor cost ÷ revenue.

Prime cost % = food % + labor %. Industry bands: green under 60%, amber 60-65%, red over 65%.

Use the same period for all three numbers (a week or a month). Mixing periods is the #1 way this gets wrong.

Prices are before GST/HST. Add tax on top of the price shown, never inside your margin. Estimates, not advice.

Verdict

Barely. This is tight

Watch zone. 60-65% is survivable but thin. Find 2-3 points in labor scheduling or menu pricing.

Prime cost61.1%
Food cost %
29.5%
Labor cost %
31.6%
Prime cost $
$58,000
Left for everything else
$37,000
Conservative yearly leak$6,000

Every point of prime cost over 60%, on a year of this revenue, halved. Zero means you are under the line.

Save in workspace
Get cost tips for your trade

Occasional emails from ChickenPieces with cost tips and supply deals. Unsubscribe any time. Privacy.

Field Pack
Restaurant Prime Cost Recipe Book

The printable worksheets, templates, and benchmarks behind this calculator. $29, one-time.

Not on sale yet. Drop your email and we'll tell you when it opens — the free calculator above works right now.

See what's inside
Keep it

Want this saved, with your real numbers?

One ingredient list feeds every plate, the menu, the bar and labour. Change a supplier price and every plate re-costs. Saved on this device, free.

Open the restaurant workspace

More restaurant calculators

All Restaurants